WORK RESUME
A running listing of work performed.
Nuclear Power - Capital Projects
Conceptual, Budgetary, and Detailed Cost Estimates
Major Projects
- Main Generator Stator Replacement & Field Rewind
- Reactor Coolant Pump, Motor, and Seal Replacement
- Degraded Grid
- Cooling Tower Replacement (A/B/C)
- Digital Modernization
- Business Modernization
- Second License Renewal
- Severe Accident Management Program
Mechanical
- Segmented Cavity Seal Ring
- U2 Pressurizer Spray Valve Replacement
- HDP & Cond Pump
- U1 Pressurizer Spray Valve
- Segmented Cavity Seal Ring
- Circ Water Chemical Feed Station
- Sprinkler System Modifications
- U1 SW Valve Replacement
- SW L&C Valve Replacement
- VESDA Incipient Detection
- Room Cooler Tube Side Inaccessibility
- SFP Filtering
- Condenser Bellows Replacement
- U2 AFW Pipe Supports
- U1&U2 Evap Abandon Removal
- U2 MUR LEFM
- Fire Pump House Equipment Upgrades
- HDP & Cond Pump Cooling Water Piping Vulnerability
- U1 LEFM
- N2 Supply Line Repair
- CVCS and CS Check Valve reverse flow leakage test
- SGBD TC-1150 Operating
- Upgrade RCP Seals
- CCW to RCP Thermal Barrier Isolation Valve Closure
- U2 SW Valve Replacement
- Tri Nuc Starter Box
- Segmented Seal for Reactor Cavity
- Nitrogen supply piping
- Hydrogen Purity Monitor
- Weld Overlay – HHSI SWOL
- Pressurizer Pressure Control Valve Replacement
- CCW HX Replacement
Electrical/I&C
- Obsolete RCP Vibration Monitoring Sys Upgrade
- DRPI (DADS)
- New Rod Drive Cabinets & MG Sets
- Instrument Air Dryer
- TDAFW Positioner
- SPV RELAYS
- Cyber Security BIDs Replacement
- Analog Gauge Reader
- APRF Motor Vib
- Switchyard Cameras - Ph3
- M&D - Sensors
- SSPS Card Replacements
- Transmitter Replacements
- 125V DC Distribution Panel Replacements
- Replace Obsolete Diesel Relays
- Obsolete GE AK Breakers
- Turbine Controls Upgrade SPV Elimination
- U1 7300 Digital & SGFP Controls
- Replace L&N Transmitters
- Three Position Disconnects in SB Comm Room
- Remote Oil Addition Modifications for RCP Motors
- MCB Annunciator Replacement U1&U2
- Replace aged Optical Ground Wire backbone fiber
- SPV Rod Control Power Cabinet Replacement Control
- SJAE SPV Elimination
- Raceway and Cable from U34 to U12
- Reserve Aux Transformer Replacement (1B, 2A, 2B)
- Installation of U1U2 Dynamic Disturbance Recorder
- RPS Digital Upgrade
- Xenon rate SAIPMS data retrieval
- MHF Alarm does not reset
- EH Skid SPV
- Diesel Relay Replacement
- Condenser Demin Controls
- Battery Chargers
- RTU & Watt Hour meter replacement
Civil/Structural
- Improvements to Door 2536 Service Life
- U1&2 RMWST Roof Replacement
- U1&2 RWST Roof Replacement
- ISFSI Aggregate Replacement
- Safety Related EDG with Building
- Landfill and Access Road
- Eliminate V12 Vehicle access point
- Eliminate westside vehicle barrier system
- Modify westside security fencing
Government/National Lab
Replacement Property Values (RPVs) Estimates
Entry Control Facilities
Pedestrian Bridges
Research Platforms
Vehicle Bridges
Enhanced Parking Garage
Chiller Facility
Gas Bottle Storage Facility
Hot Off Gas (HOG) Filter Facility
Free Air CO2 Experiment Complex
Well, Non-Potable Water
Peat Bog Soil Warming Enclosure
Main Water Reservoir
Water Dist. Sys. Maint Materials Storage
Spring Water Pumphouse
Water Wells
Guard Tower
Sanitary Waste Septic Tank
Solar Photovoltaic Array
Sewage Digester Facility
Solar Array
Compressed Gas Cylinders Storage
Single-Axis Tracking Photovoltaic System
Heavy Equipment Storage Shelter
Fuel Service Facility
Salt Storage Building
River Pump Station
Stack Monitoring Facility
Waste Retention Basin
Exhaust Stack
Energy Systems Staging and Storage Pad
Mixed Waste Storage Pad
Recyclable Material Staging Area
Demineralized Water Tanks
Filter Pump House Main Pool
Radio Communication Tower
Compressed Gas Cylinder Storage
Waste Sample Bldg.
Cooling Towers
Central Exhaust Facility
Hot Storage Pad
Diversion Tanks
Sidewalks
Alarm System - Offsite Warning Device
Wells, Groundwater Monitoring
Demineralized Water Storage Tank
Machine Storage Shed
Netted Enclosure
Technical Rescue Training Facility
Fire Department Carport
Salt Shed
Ring Tunnel Air Unit 94T (each)
Reactor Building
Line Truck Parking Canopy
Site Wide Generators
Site Wide Air Monitoring Stations
Site Surface Water Monitoring Stations
Site Septic Tanks
Site Wide Parking Areas
Site Secondary Roads
Site Tertiary Roads
Site Wide Way Finding Signs
Site Meteorological Towers
Site Wide Compressed Air System
Site Wide Electrical Distribution System
Site Wide Telecommunications System
Site Wide Natural Gas Distribution Syst.
Site Wide Steam Distribution System
Site Wide Water Distribution System
Site Wide Non-Potable Water System
Site Wide Sewage System
Site Wide Storm Water Drainage System
Site Wide Chill Water Distribution Syst.
Site Wide Fire Protection System
Site Wide Security Protection System
Commercial & Residential
Conceptual Opinions of Probable Cost
Nantahala Outdoor Center Lodge, Hotel and Restaurants
Fort Payne, AL Police Courthouse Renovation
UTC Wrestling & Volleyball Center
UTC Soccer Field House
UTC Basketball Court and Field Hockey Field
Chattanooga State Community College CAT Bldg Reno
Design Phase Cost Verification Estimates
UTC - I-AMAC
TN National Golf Clubhouse & Restaurant
Bledsole County Corrections Facility Equipment Barn
Polk Street Event Hall
UT Space Institute ADA Renovation
Henry Horton State Park Visitors Center & Restaurant
General Contractor Estimating Support
Stoveworks Building Stabilization
Custom Residence, Jasper Highlands
Capital Funding Campaign Estimates
Houston Museum of Decorative Arts - New Facility
Signal Mountain Library Reading Room Addition
Assessments, Tool Development, & Training
Assessments
Construction Industry - Annual Escalation Study of Materials and Labor
RSMeans Data Applicability Assessment for Government Work
WinEst Custom Development
WinEst Template and Estimating Database (100k+ items)
WinEst Formula Line Items
Custom MS Excel Spreadsheet Tools
Business Staff Management Tool
Materials, Labor, Subcontracts with WBS summaries.
Project Cash Flow Tool
Project Risk Model for Contingency & Management Reserve (@Risk)
Estimating Tool with Integrated Database
Training & Processes
Nuclear Estimating Training Module for Modification Projects
Work performed before SIDE Partnership, LLC
This is a collection of work performed mostly in managing and performing roles with a prior employer.
DOE – Fusion Science Advisory Committee – 2020
New Tokamak User Facility
Stellarator Facility
Fusion Prototypical Neutron Source
RF Source&Launcher Test Facility
High Energy Petawatt Laser (EP-OPAL)
High Heat Flux Component Validation & Qualification Facility (H2F2)
Blanket Component Test Facility
High Average Power Laser (HAPL-kBELLA) Project
Entergy Nuclear - Grand Gulf Nuclear Station - 2017
- Domestic Water Plant Brine Tank Replacement
- Main Security Sallyport Swing Gate
- Seal Steam Generator Replacement
- Circ Water Expansion Joint Replacement
- Fire Detection System (P65)
Entergy Nuclear - Waterford 3 - 2017
- Vibration Monitoring Equipment
- Replacement of Seismic Monitoring Equipment
- Provide Manual Transfer Switching Capability on TEDG
- Turbine Trip System, Mechanical Overspeed and Protective Trip Devices Replacement
- Travelling Screens Auto Controls Implementation
- Replace ENI Safety Channel Processing Drawers due to Obsolescence
- Broad Range Gas Monitors
- PWR Incores RF22
- Steam Generator Feedring Modification
- Intake Cannel Weir Wall Replacement
- Address Obsolete Rosemount Xmters
- Turbine Valve Refurb RF22
- HP Turbine Diagonal Stage Replacement
- MCC 315B Repair & Corrosion Mitigation
- RF22 Feed Pump B Rotor Replacement
- Fire Protection Valves Replacement
- Replace All MXL Fire Protection Panels
Entergy Nuclear - River Bend Nuclear Generating Station - 2017
- Fire Detection System
- Acid Feed System Skid Replacement
- Replace Liquid Radwaste (LWS) Discharge Line
- Radwaste Streaming
TVA - Sequoyah Nuclear Plant - 2017
316b Traveling Water Screen Replacement
TVA - Watts Bar Nuclear Generating Station - 2017
- 316b Traveling Water Screen Replacement
- Replace Category 1- A&B SDBR and A&B MCR Chillers
- Replace U1 EGTS Modulating Dampers
- ERCW Motor Power Cable Replacement
- CO2 Compressor Replacement for 6-Ton & 24-Ton Cardox Units
- Replace TDAFW Traps with Orifices
- MDAFW LCV Replacement
- Demin Water Booster Pump Installation for 2 Unit Operation
- Obsolete Target Rock Valves in the SGBD System
- Replace Radiation Monitoring System-Phase 2 (6 skids) 400's
- WBN Replace U1 Incore Instrument Room Chilled Water Check Valves (4)
- Waste Gas Compressor Replacement
TVA - Browns Ferry Nuclear Plant - 2017
- 3A1 & 3C1 HP Feedwater Heater Replacement
- U2 and U3 Amertap System Upgrade
- CRD RPIS and Temperature Indication Improvement
- Replace 4kV Shutdown Board Battery Chargers
- Generator Relaying
- Ventilation System Air Wash Material Upgrade
- Maintenance Building – Cost Savings Study
- Traveling Water Screens 4kV Infrastructure & Controls
- CCW Cable Replacement
AECON - Darlington Nuclear Plant - 2017
Heavy Water Management Building West Annex
Duke Energy - Oconee Nuclear Station - 2017
Main Power Relay
Exelon - Calvert Cliffs Nuclear Power Plant - 2017
Metal Clad Building
Day & Zimmerman - 2017
ACI System Mechanical Install
Day & Zimmerman - Plant Bowen - 2017
Front Reheater Replacement
Day & Zimmerman - Plant Neal - 2017
Submerged Chain Conveyor
Day & Zimmerman - Plant Roxboro - 2017
SFC Piping Project
Southern Nuclear - Plant Farley - 2017
R60s & R70x Rad Monitor Replacement
Southern Nuclear – Vogtle Unit 3 & 4 - 2017
EDCR No. SV3-CC01-GEF-000091_Personnel Hatch
Coatings
Southern Nuclear - Vogtle Unit 4 - 2017
CWS Pump Intake Structure Concrete Embeds
NIPSCO - Bailly Generating Station - 2017
Mega Voltage Amerage Reaction (MVAR)
NIPSCO - Mitchell Generating Station - 2017
Mega Voltage Amerage Reaction (MVAR)
WACHS - P&G Beauty Care Building - 2017
Off-Rack Piping Estimate
Southern California Edison - SONGS - 2017
Fuel Transfer Ops
Repair of the Rip Rap Scope per M2 Amendment 8
Class B/C Waste Filters Disposal- Co.11
San Onofre Nuclear Generating Station - 2017
HOLTEC – ISFSI Pad Expansion
Phase 3 Demolition Below 3 FT
Site Dewatering
WACHS Technical Services—Protor & Gamble-2017
Estimate for new production line piping
Entergy—Grand Gulf -2017
Estimate for Domestic Water Brine Tank Replacement
Entergy—ANO-2017
Estimate for Nalco Injection Pipe Replacement
Southern Company—Gorgas Generating Plant--2016
Screening Estimate New Start-Up Boiler
NextEra Energy - Point Beach Nuclear Plant--2016
Bottoms Up Spent Fuel Pool Heat Exchanger Modification
Exelon - Calvert Cliffs Nuclear Plant—2016
Perform Estimate LITE for installation of 3rd Feed Pump
Exelon - Peach Bottom—2016
ISFSI Pad Expansion Project Independent Bottoms Up Cost Estimate
Exelon - Calvert Cliffs Nuclear Power Plant - 2016
ESFAS/AFAS Independent Cost Estimate
Exelon - Nine Mile Point - 2016
Unit 2 Generator Step-up Transformer Replacement Conceptual Estimate
Duke Energy - Oconee Station - 2016
Bottoms Up estimate for Installation of New Power Circuit Breakers
TVA – Browns Ferry – 2014
Perform independent bottoms up estimate for new site maintenance building
Southern California Edison – S.O.N.G.S. – 2014
Develop detailed bottom up estimates for multiple Cold and Dark modifications in preparation for decommissioning.
American Electric Power – 2010
Perform detailed independent estimate for DC Cook’s Condensate Polisher System Project.
Luminant Energy – 2010
As Owner’s Representative worked with Luminant management to perform review and analysis of MNES/URS/B&V estimate data during annual update of Comanche Peak Units 3 & 4 project.
NuScale Power – 2010
Performed independent review and analysis of the design and implementation estimates for the NuScale Small Modular Reactor project.
Tennessee Valley Authority - NGDC – 2010
Developed working desktop procedure for project estimate development for the NGDC PMO organization. Developed and conducted two day training course for implementation with PMO personnel.
UniStar Nuclear – 2010
Performed independent review and analysis of EPC Contractor’s field non-manual and Owner’s non-manual oversight organizations proposed for the Calvert Cliffs 3 nuclear project.
Constellation Nuclear – 2009
Performed multiple independent cost estimates for capital modifications at all three Constellation nuclear facilities (Calvert Cliffs, Nine Mile Point, and Ginna).
Florida Power & Light – 2009-2010
Performed independent bottom up estimates on 44 individual projects including design and implementation labor and materials, field non-manual, owner’s oversight and LAR costs for the Unit 3 Extended Power Uprate at Turkey Point Nuclear Station.
Dominion – 2009 - 2010
Performed assessment of five consortium proposals for the North Anna Unit 3 New Nuclear Project.
Luminant Energy – 2009
As Owner’s Representatives worked with Luminant management to perform review and analysis of MNES/URS/B&V estimate data during annual update of Comanche Peak Units 3 & 4 project.
STP Nuclear Operating Company – 2009
Worked with NRG, STP-NOC and Bechtel to perform review and analysis of STP Units 3 & 4 estimate information from Toshiba and Fluor.
NextEra Energy – 2009
Performed independent review and analysis of the Point Beach Station Unit 1 EPU project estimate.
American Electric Power – 2009 - 2010
Perform detailed independent estimates for ISFSI (Dry Cask Storage) and Security Computer Replacement projects. Also perform independent estimate validations on 6 capital modification projects including MSR replacement.
Duke Energy - 2009
Performed independent review and analysis of McGuire Station Main Generator Stator Project
UniStar Nuclear - 2008
Performed an independent analysis of construction craft performance unit rates used in the owner’s estimate to build the Areva designed next generation EPR nuclear power generating facilities in the US.
American Electric Power – 2008
Performed a review and analysis of AEP corporate estimating process, procedure, and personnel skill sets.
Duke Energy - 2008
Prepared independent estimates for design and construction of six Wind Turbine Energy Farms
Matrix Service Inc - 2008
Prepared independent estimate for the Sandy Creek Project – Tank Farm and Coal Chute Construction
Delta-T Corporation - 2008
Performed contractor claims evaluations on post construction claims at new construction Ethanol plants
SIDE Partnership, LLC © 2026